Case Studies

Lake Winds Energy Park, Michigan

Location: Mason County, Michigan
Owner/Operator: Consumers Energy

Lake Winds Energy Park is a 56-turbine, 100 megawatt wind farm in West Michigan which began operations on Thanksgiving Day 2012. HGC was contracted by the Mason County Planning Commission to perform a sound compliance study for the purposes of verifying that the Lake Wind Energy Park meets the sound standards of the local county’s zoning ordinance.

Acoustical Engineering Services Included:

  • Conducted detailed acoustical audit of Wind Farm
 

 

Need Answers?

Reach out to our acoustical consultants now.

Call: 1-833-205-7300

Reach out to a Consultant